Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope requires the completion of structural surveys on bridges spanning roads and existing rail assets. Instructed work may include visual and dimensional surveys of assets, ground-breaking activities associated such as foundation pitting and trenching , masonry coring as well as 3D mapping of assets.
Publicado
16.09.2026
Aberto para propostas
16.09.2026
Prazo
22.09.2026
Kier Infrastructure - UXO Site Surveys
Fechado·Sep 28
Kier Infrastructure - Cultural Heritage Surveys
Fechado·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Fechado·May 26
Kier Infrastructure - Water Environment Surveys
Fechado·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Fechado·May 26
Kier Infrastructure - Air Quality Surveys
Fechado·May 26
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q2 2026
Concedido·Oct 26
Stock Condition Surveys (Commercial and Educational Buildings)
Concedido·Jul 31
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q1 2026
Concedido·Jul 23
CA18150 - Area Measurement Reports
Concedido·Jul 23
ENQ1301 - CYP 2026/27 Condition Surveys
Concedido·Jun 26
GB-St Helens: Asbestos Surveying Contract Award Notice
Concedido·Jun 12
The Responsible Medical Officer (RMO) Braintree
Concedido·Oct 26
The Purchase of 8 seater Vehicles
Concedido·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Concedido·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Concedido·Oct 26
37418 - West Gate School
Concedido·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Concedido·Oct 26
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.