The purpose of this requirement is to upgrade the heating system at Marks Farm Community Centre and Silver End Village Hall, as well as the supply and installation of a new Photovoltaic Array on the roof of Silver End Village Hall. Silver End Village Hall is a large community centre in Silver End. Its main use is to provide a community facility for local residents. It has a changing room to the rear managed by Braintree District Council and current tenant's, include a Social Club, Silver End Parish Council offices, ECC Family Hub and small to medium sized events business, who hire out their space to a nursery, a library and for events. Marks Farm Community Centre is a medium sized community centre in Braintree. Its main use is to provide community facilities for local residents. It has a changing room to the rear managed by Braintree District Council and its current tenant is a small to medium sized events business, who hire out their space to a nursery and also for events. The existing heating systems in both buildings have reached the end of their serviceable life and are now life expired, resulting in increasing maintenance needs and risk of failure. The refurbishment will replace outdated components, improve accessibility, renew mechanical and electrical systems, and ensure compliance with current building, health and safety and landlord obligations. The works will also support ongoing lettability of the building's and contribute to maintaining statutory standards such as minimum energy efficiency requirements.
Prazo
26.05.2026
Publicado
13.08.2026
Concedido
13.08.2026
Delivery of Refurbishment Works at Multiple Sites
Concedido·Aug 13
Enterprise Centre Refurbishment Works
Concedido·Aug 13
CCTV installation
Concedido·Jul 31
Transformation
Concedido·Jul 30
GB-Braintree: TPPL Braintree District Council NEPO GM & P Lot 1 - 18 x Various GMP Equipment (New) (28236)
Concedido·Jun 12
Xpress Software
Concedido·Apr 1
The Responsible Medical Officer (RMO) Braintree
Concedido·Oct 26
The Purchase of 8 seater Vehicles
Concedido·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Concedido·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Concedido·Oct 26
37418 - West Gate School
Concedido·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Concedido·Oct 26
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.