•During stage 4 Ingleton Wood LLP will attend 2 no. design coordination meetings and will receive a full package of information for review and comment, providing comment (status a,b,c etc) and includes a follow up review. •During stage 5 Ingleton Wood LLP will attend site 15no. times, note Structural and Civil have allowed for 6no. visits only. •During stage 6 we have allowed to attend site twice for carrying out defects and post completion inspections and receiving a full package of O&M information and as-builts , so that one full check is carried out.
Prazo
10.05.2026
Publicado
11.05.2026
Awarded
11.05.2026
GB-Colchester: 0500 - PA - Compartmentation Install and Remediation
Aberto para propostas·Oct 28
GB-Colchester: 0499 - PA - Fire Door Remediation
Aberto para propostas·Oct 28
GB-Colchester: 0450 - PA - Asbestos Removal Works
Concedido·Oct 9
GB-Colchester: 0471 - PA Compartmentation and Internal Storage Fire Doors
Concedido·Oct 9
GB-Colchester: 0502 - PA Unadopted Highways
Fechado·Sep 23
GB-Colchester: 0475-PA Enforcement Agents
Concedido·Sep 17
Kingston Small Sites 2 - RIBA Stages 0- 3: Design Services
Concedido·Oct 28
Cumberland Local Plan Transport Baseline, Strategic Analysis and Transport Assessment
Concedido·Oct 27
Homes England - Legal Framework - 2026-27 Carbon Inventory Support
Concedido·Oct 26
Ellesmere Port Movement 2026
Concedido·Oct 26
DPS1 1438 - Fell Trees
Aberto para propostas·Oct 23
DPS1 1429 - Tenancy Tree Work
Aberto para propostas·Oct 23
Infrastructure Connection Design Support - Pathology Lab
Concedido·Oct 30
Provision of Pre-Paid Cards
Concedido·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Concedido·Oct 30
Business Travel Services
Concedido·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Concedido·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Concedido·Oct 30
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.