Restoration work to the concrete war memorial in Bolehill, Wirksworth. The memorial requires new rain gulleys and delicate repairs to the pediment and other areas to carefully reproduce the colour, texture, profiles and lettering of the monument. The memorial is unusual in being made of early concrete (c 1920s)
Publicado
19.01.2026
Aberto para propostas
19.01.2026
Urgent Works at Pine Court, nos. 84-85, 86-87, 88 and 91 Kirkgate, Leeds City Centre
Concedido·Jan 30
Urgent Works at Pine Court, nos. 84-85, 86-87, 88 and 91 Kirkgate, Leeds City Centre
Concedido·Jan 30
Concrete War Memorial Restoration
Planejamento·Jan 19
Old Park School Boardwalk - AWARD
Concedido·Nov 17
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Concedido·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Aberto para propostas·Oct 23
Interim Deputy CDIO
Concedido·Oct 23
DPS1 1438 - Fell Trees
Aberto para propostas·Oct 23
Pi Drive 2 Plus Motor
Concedido·Oct 23
WSFT - Capital - New Hospital Programme
Concedido·Oct 23
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.