Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. E&P Scope of Work: The supply, installation, testing and commissioning of the point heating system. This includes, but is not limited to: Mains Distribution equipment, 230v and 110v LV cabling, Heater strips, Heat retainers, Clamp lock heaters, TCBs', PHT's and associated controls.
Publicado
07.10.2025
Aberto para propostas
07.10.2025
Prazo
13.10.2025
Oldfield Road - E & P Works
Fechado·Oct 22
Oldfield Road - Telecoms
Fechado·Oct 22
Brewery Turnback - ES6-8 Devegetation Works
Fechado·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Fechado·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Fechado·Oct 7
Brewery Turnback - ES6-8 Permanent Way
Fechado·Oct 7
CBC-1682-FA-LS-FC-58-ZH 35 Upper Shelton - AWARD
Concedido·Oct 24
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Aberto para propostas·Oct 23
Interim Deputy CDIO
Concedido·Oct 23
DPS1 1438 - Fell Trees
Aberto para propostas·Oct 23
Pi Drive 2 Plus Motor
Concedido·Oct 23
WSFT - Capital - New Hospital Programme
Concedido·Oct 23
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.