Loading Otnox...
Otnox
UKReino Unido·Comprador: MINING REMEDIATION AUTHORITY

Battery Energy Storage Systems (BESS)

Concedido·18 mar 2026·GBP 296,929

The Mining Remediation Authority (MRA) is seeking a contractor to provide battery energy storage solutions for two of our Mine Water Treatment Schemes (MWTS) where solar PV systems are already installed. For each site, the costs for the following items was requested: • Battery Energy Storage System(s) (BESS) • Battery Energy Management System (BEMS) • Replacement of existing solar PV inverters where required to ensure compatibility with the retrofitted BESS. Additional information: We have completed a compliant procurement by mini competition through the Crown Commercial Services Demand Management and Renewal Framework (RM6314). CCS DMR Framework - Lot 2.1 - Procurement of Battery Energy Storage CCS DMR Framework Ref: DMR-45213-2025

Prazo

26.01.2026

Publicado

18.03.2026

Concedido

18.03.2026

Otnox

Encontre licitações das quais vale a pena participar.

Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.

  • Documentos da licitaçãoConsulte os arquivos disponíveis em um só espaço de trabalho.
  • Requisitos e riscosSolicite uma análise dos documentos com referências às fontes.
  • Sua seleção de licitaçõesContinue com os mercados e setores selecionados.