The BSI is seeking a supplier to deliver a Battery Energy Storage System (BESS) solution, including supply, installation, commissioning, and integration with the new Main Switchboard and related site electrical infrastructure. The system must support site electrification, improve energy resilience, optimise energy usage, maintain continuity of supply during outages, and enable integration with the new Main Switchboard and future infrastructure.
Publicado
21.06.2026
Aberto para propostas
21.06.2026
Prazo
24.07.2026
400L and 150L Autoclaves
Aberto para propostas·Oct 20
Confocal Microscope
Aberto para propostas·Oct 18
Differential Scanning Calorimetry (DSC)
Aberto para propostas·Oct 18
ERP Programme Legacy Modifications and Integration Provider
Fechado·Jul 9
ERP Programme Payroll Solution & Implementation Services
Fechado·Jun 26
DB2 Main Switchboard Upgrade (MSB)
Fechado·Jun 22
RFP-Health NZ Northern Region Panel for Suppliers of Building Management Services (BMS) Projects and Maintenance Services
Aberto para propostas·Oct 19
RFI Orion Procurement Tracker
Fechado·Oct 8
ROI Non SF6 Circuit Breakers
Fechado·Sep 3
RFT ES553201 Bewdley Street Substation Upgrade and Area LV Reinforcement
Concedido·Jul 1
RFT ES560984 Pilot Cable testing - Area 1 Ferrymead/Sumner
Concedido·Jun 30
RFT ES548606 Pole Replacement, Package 25 - FY27
Concedido·Jun 29
PNCC - Waste Water Treatment Plant Seismic Strengthening
Aberto para propostas·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Aberto para propostas·Oct 30
Total Mobility and wider PT Assurance
Aberto para propostas·Oct 30
New Care Response for Taranaki Manawatū
Aberto para propostas·Oct 30
National Parking Equipment Replacement Programme
Aberto para propostas·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Aberto para propostas·Oct 30
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.