This Scheme will cover Active Travel improvements on Shadsworth Road and Haslingden Road, Blackburn, and will encompass the following: • Removal of kerbed centre islands, • Alteration to existing zebra crossing • associated electrical works, • relocation of a kerbline and widening of the footway, • footway reconstruction as necessary, • Alterations to existing AD signage, • Removal and provision of new footway markings, • Footway surface course overlay using tarmac materials or slurry seal • carriageway patching.
Prazo
24.03.2026
Publicado
07.07.2026
Concedido
07.07.2026
Carriageway Surfacing 25/26 - Phase 4
Concedido·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Concedido·Sep 28
Carriageway Surfacing 26/27 - Phase One
Concedido·Sep 28
Active Travel 2026 - Phase 1
Concedido·Jun 10
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Concedido·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Concedido·Oct 10
BBV HS2 MWCC North - Pumped Drainage
Aberto para propostas·Oct 21
Thrybergh War Memorial Civil Works
Concedido·Oct 7
Greasbrough War Memorial Civil Works
Concedido·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Fechado·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Concedido·Sep 11
Comberton Greenway - Sidgwick Avenue Construction
Concedido·Sep 9
The Responsible Medical Officer (RMO) Braintree
Concedido·Oct 26
The Purchase of 8 seater Vehicles
Concedido·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Concedido·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Concedido·Oct 26
37418 - West Gate School
Concedido·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Concedido·Oct 26
Crie uma conta para analisar este concurso e encontrar oportunidades semelhantes.