The works relate to 13 door sets and shall be undertaken in two separate visits per door set as follows: Visit 1 - Decommissioning Isolate and decommission the existing magnetic lock installed on each designated door set. Ensure the existing access control system remains safe and secure following decommissioning activities. Coordinate works to facilitate the fire door upgrade programme. Visit 2 - Commissioning Attend site following completion of the fire door upgrades and installation of replacement magnetic locks by others. Commission the newly installed magnetic locks into the existing access control system. Configure and verify operation of each magnetic lock in accordance with the existing system requirements. Testing and Commissioning Upon completion of the commissioning works, the Contractor shall: Test each magnetic lock to confirm correct operation. Verify door release functionality. Confirm fail-safe operation where applicable. Ensure integration with the existing access control system is functioning correctly. Report any defects, faults, or issues identified with the existing equipment or system infrastructure to the Client.
Termin
30.07.2026
Opublikowano
18.08.2026
Udzielone
18.08.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Udzielone·Oct 12
Dirty Utility Works GRH Tower Block
Udzielone·Sep 8
Provision of Emergency Asbestos-related works
Udzielone·Sep 2
King Builders Various Minor Works Projects
Udzielone·Aug 19
Project Management Support _ Provelio
Udzielone·Aug 17
CGH BMS Upgrade Project 2026/2027
Udzielone·Aug 6
Opswat Metadefender licensing, support and design services
Udzielone·Oct 27
Asbestos surveying and consultancy
Udzielone·Oct 27
ASC Data Platform Development Support
Udzielone·Oct 27
ITEP1273 - Citizen Space -26/28
Udzielone·Oct 27
2026-10-27 09:00 - QBE476 Red Lodge to Innov8 Workshops, Rougham - AWARD
Udzielone·Oct 27
BPB000196 South Mainstream Taxi
Udzielone·Oct 27
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.