The South Taranaki District Council (STDC), as part of its ongoing Road Rehabilitation Programme, proposes to renew a section of the water supply reticulation network at the intersection of Skeet Road and Palmer Road. The renewal is being undertaken in conjunction with planned intersection concrete pavement works, providing a practical and cost-effective opportunity to replace aging water infrastructure while avoiding future excavation and reinstatement costs. The works involve the decommissioning, or abandonment, of approximately 68m of existing DN200 asbestos cement (AC) water main located on Palmer Road at its intersection with Skeet Road, and the installation of a new DN250 HDPE PE100 SDR11 PN16 water main. The scope of works includes the supply and installation of all necessary valves, fittings and associated appurtenances required to integrate the new pipeline into the existing water supply network while maintaining continuity of service to customers. The new pipeline may be installed using open trenching or trenchless methods, such as Horizontal Directional Drilling (HDD), subject to site conditions, traffic management requirements, existing underground services, and approval by the Engineer. The works will include all excavation, drilling, pipe installation, network connections, testing, reinstatement, flushing, pressure testing, disinfection, and commissioning necessary to place the new water main into service. Additional deliverables include the full reinstatement of all disturbed areas outside the road rehabilitation footprint, together with the provision of as-built drawings, asset data, componentisation records, and supporting quality assurance documentation in accordance with Council requirements to support ongoing asset management and future maintenance.
Opublikowano
17.08.2026
Przyjmowanie ofert
17.08.2026
Termin
11.09.2026
Contract 26_08 Hastings Road Pavement Rehabilitation
Przyjmowanie ofert·Oct 30
Tayler Street Wastewater Pipe Renewal (Eltham)
Zamknięte·Sep 6
South Taranaki District Council Footpath Replacements 2026/27
Zamknięte·Aug 27
King Edward Street, Eltham Construction of Open Drain
Zamknięte·Aug 10
Hunter Street Water Supply Pipe Renewal
Zamknięte·Jul 27
South Road Wastewater Pipe Renewal (Hāwera)
Zamknięte·Jul 26
27-041 Second Waiwhakaiho Crossing and Smart Rd Future Urban Zone Feasibility
Przyjmowanie ofert·Oct 23
Advance Notice: Aquatics Centre Non-Slip Flooring Replacement - RFP
Zamknięte·Oct 20
Lake Rotokauri Walkway
Przyjmowanie ofert·Oct 14
27-039 Tarata Road Resilience Project Sites 5b Construction Services
Przyjmowanie ofert·Oct 12
RFT - Main Building Contractor for the New Food Technology Room at Waiuku College
Przyjmowanie ofert·Oct 11
Burwood Landfill Site C : Provision of Plant hire, maintenance and operation of Burwood Landfill
Przyjmowanie ofert·Oct 5
PNCC - Waste Water Treatment Plant Seismic Strengthening
Przyjmowanie ofert·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Przyjmowanie ofert·Oct 30
Total Mobility and wider PT Assurance
Przyjmowanie ofert·Oct 30
New Care Response for Taranaki Manawatū
Przyjmowanie ofert·Oct 30
National Parking Equipment Replacement Programme
Przyjmowanie ofert·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Przyjmowanie ofert·Oct 30
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.