ASG has been commissioned to deliver the supply, installation, testing, and commissioning of access control systems, CCTV equipment, and associated infrastructure within the Tower Basement at Gloucestershire Royal Hospital. To support the safe and efficient delivery of these works, this related project involves the provision of a secure temporary site compound within the Gloucestershire Royal Hospital estate. The scope includes the supply, installation, maintenance, and subsequent removal of the compound, which will be used for the secure storage of materials, equipment, and tools required for the Tower Basement Access Control and CCTV project. The compound will provide a controlled and secure storage facility, helping to protect project assets, maintain site safety, reduce operational disruption, and support the timely delivery of the works. Upon completion of the project, the compound will be fully decommissioned and removed, with the area reinstated as required.
Termin
01.07.2026
Opublikowano
17.07.2026
Udzielone
17.07.2026
Lot 12 - Albert Street Play Area
Udzielone·Sep 22
A66 Tees Dock Road Lackenby Access
Udzielone·Sep 21
Willow House Enabling Works
Udzielone·Aug 7
Oceansgate Phase 3.1 Enabling Works
Udzielone·Jul 24
Old Westgate Station Hotel Development, Wakefield
Udzielone·Jul 1
M6 Lune Gorge - Roundthwaite Box - Civils Package
Zamknięte·Jun 25
Opswat Metadefender licensing, support and design services
Udzielone·Oct 27
Asbestos surveying and consultancy
Udzielone·Oct 27
ASC Data Platform Development Support
Udzielone·Oct 27
ITEP1273 - Citizen Space -26/28
Udzielone·Oct 27
2026-10-27 09:00 - QBE476 Red Lodge to Innov8 Workshops, Rougham - AWARD
Udzielone·Oct 27
BPB000196 South Mainstream Taxi
Udzielone·Oct 27
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.