TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too. Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Roads. Of the off-site bores, only one is currently in service, and raw water is conveyed to the treatment plant via a single 150mm diameter pipeline. The two other off-site bores are new. Additional raw water conveyance capacity is required to enable supply from the two new off-site bores and to meet increasing demand. There is also a requirement to introduce redundancy into this part of the system. To achieve this, TDC requires the construction of a second raw water pipeline. We want to trial giving you the parameters, and you provide us with the full package – design through construction, testing and completion of the installed pipeline.
Opublikowano
08.09.2026
Przyjmowanie ofert
08.09.2026
Termin
05.10.2026
RFP 2826 South Timaru Hydraulic Model Build and System Performance
Przyjmowanie ofert·Oct 15
RFP2828 - Timaru CBD Tile Replacement Programme Investment and Delivery Plan
Zamknięte·Sep 22
2813 - Stafford Street and Barnard Street Water Services Renewal
Zamknięte·Sep 6
RFT2797 - Kellands Hill/Rosewill Valley/Cartwrights Roads “SH1 Resilience Route” Project
Zamknięte·Aug 19
RFT2647- Landsborough Road Bridge
Zamknięte·Aug 14
RFP2702 - Talbot Street Sewer Main Upgrade
Zamknięte·Jul 8
Lake Terrace Water Treatment Plant Seismic Strengthening
Przyjmowanie ofert·Oct 25
Water and Wastewater Assets Valuation
Przyjmowanie ofert·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Przyjmowanie ofert·Oct 18
Water Mains Resilience Phase Three
Przyjmowanie ofert·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Przyjmowanie ofert·Oct 18
Accelerated Delivery Programme 2.0
Przyjmowanie ofert·Oct 18
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Przyjmowanie ofert·Oct 29
Herschell Street Carpark Redevelopment
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Przyjmowanie ofert·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Przyjmowanie ofert·Oct 29
Bayswater School - Main Contractor for 1, 2, 3, 5, 100636, site: Full Roof Replacements, fixings, and Clearlite roofing.
Przyjmowanie ofert·Oct 29
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.