Masterton District Council are seeking a suitable, qualified Contractor who can undertake the Nikau Heights Reservoir Renewal Construction (the Works). The Works will involve: - Demolition and/or removal of existing timber tanks, redundant pipework, fencing, trees and other vegetation. - Civil work including topsoil stripping, site trimming and leveling, ground improvement via 1m deep hardfill base, pre-cast valve manhole, permeable pavement installation. - Construction of new reinforced concrete tank foundations and valve pads. - Integration with MDC’s nominated tank installer, for the construction and commissioning of two 500 kL galvanized steel tanks with new liners, pipe connections, and pipe supports (supplied by MDC). - Supply and installation of associated stainless steel (SS) and polyethylene (PE) pipework, valves, and flow meters. - Integration with the existing valve chamber, rising main, transmission main and drainage/scour outlet including enabling works to demolish and replace valve chamber roof, if required. - Integration with MDC electrical and control installation. - Integration with supplier completing reinstatement works on Golf Course land - All testing, sterilisation, commissioning and handover documentation. MDC is looking for providers who have a sound methodology for the Works and will demonstrate well thought-out planning for key aspects such as working in a live potable water environment, staging and cut-in works to minimise disruption and risks to water users; an excellent track record with good referees; and a project team with the right experience. A supplier briefing and site visit will be held in Masterton on Tuesday 14th July at 10am. To indicate you will be attending this site visit please email Laura Maclean by Thursday 9th July.
Opublikowano
30.06.2026
Przyjmowanie ofert
30.06.2026
Termin
03.08.2026
DMA Inlet Meter Chambers and Associated Works
Przyjmowanie ofert·Oct 11
Masterton District Council Playground Renewal
Zamknięte·Sep 15
MDC High Street Rider Main Stage 3
Zamknięte·Sep 11
14-25/26 Kibblewhite Rd Kerb & Channel
Zamknięte·Jul 19
12-25/26 Bridges and Structures Inspections
Zamknięte·Jul 19
Masterton Library Refurbishment and Extension
Udzielone·May 14
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Przyjmowanie ofert·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Przyjmowanie ofert·Oct 29
Bayswater School - Main Contractor for 1, 2, 3, 5, 100636, site: Full Roof Replacements, fixings, and Clearlite roofing.
Przyjmowanie ofert·Oct 29
Wainui Public Toilet Block & Wastewater Renewal
Przyjmowanie ofert·Oct 28
Main Contractor for Gymnasium Floor Replacement at Clutha Valley School
Przyjmowanie ofert·Oct 28
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Przyjmowanie ofert·Oct 29
Herschell Street Carpark Redevelopment
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Przyjmowanie ofert·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Przyjmowanie ofert·Oct 29
Bayswater School - Main Contractor for 1, 2, 3, 5, 100636, site: Full Roof Replacements, fixings, and Clearlite roofing.
Przyjmowanie ofert·Oct 29
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.