The overall scope of works for this project is for the construction of a new wastewater pipeline from Katikati Wastewater Treatment Plant across Tauranga Harbour and Matakana Island and including a new marine outfall typically 1150m long. The scope of works for this contract is to provide ECI pre-construction design/methodology inputs to the consenting and design phase for renewal of cross harbour and island sections, as well as concept design inputs for the marine outfall section (not being consented at this stage). ROI Respondents will be shortlisted to two, such that an appropriate mix of construction methods and skills and experience will be represented. Respondents can offer a single method or multiple methods based on their skills and experience. Please refer to the attached ROI for further details. Please raise all questions via GETS.
Opublikowano
02.09.2026
Przyjmowanie ofert
02.09.2026
Termin
25.09.2026
ESZ Watermain Renewal Little Waihi Road
Zamknięte·Sep 28
Waihī Beach Wastewater Treatment Plant Upgrade (Design and Build) - ROI
Zamknięte·Aug 27
Advanced Notice - Upcoming Waihī Beach Wastewater Treatment Plant Upgrade (Design and Build)
Zamknięte·Aug 26
Cyclic Maintenance
Udzielone·Jul 5
Poripori Road Slip Remediation
Udzielone·Jul 5
McMeeking Road & Work Road Seal Extensions
Zamknięte·Jun 30
Lake Terrace Water Treatment Plant Seismic Strengthening
Przyjmowanie ofert·Oct 25
Water and Wastewater Assets Valuation
Przyjmowanie ofert·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Przyjmowanie ofert·Oct 18
Water Mains Resilience Phase Three
Przyjmowanie ofert·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Przyjmowanie ofert·Oct 18
Accelerated Delivery Programme 2.0
Przyjmowanie ofert·Oct 18
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Przyjmowanie ofert·Oct 29
Herschell Street Carpark Redevelopment
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Przyjmowanie ofert·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Przyjmowanie ofert·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Przyjmowanie ofert·Oct 29
Bayswater School - Main Contractor for 1, 2, 3, 5, 100636, site: Full Roof Replacements, fixings, and Clearlite roofing.
Przyjmowanie ofert·Oct 29
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.