The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed
Opublikowano
23.02.2026
Udzielone
23.02.2026
Vagtydelser til Fjernvarme Fyn
Zamknięte·Jun 4
Isolation Transformer HAV32
Udzielone·Jan 27
Levering af biokedelsand
Udzielone·Oct 29
Levering af biokedelsand
Zamknięte·Aug 12
HAV 34/35 150kV kabel, muffer og andet tilbehør
Udzielone·Jun 5
Tender for a complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA
Udzielone·Sep 26
Laboratory-scale Flash Joule Heating reactor system, or an equivalent ultrafast electrically heated reactor system
Przyjmowanie ofert·Oct 30
Tender for contract: Database with general and financial data of corporates and countries on a global scale
Przyjmowanie ofert·Oct 30
Totalrådgiveraftale, Lindegårdsskole - Udbedring af etagedæk, mv.
Udzielone·Oct 30
Udbud af Interiør og Isoleringsarbejder på Søværnets Skibe
Udzielone·Oct 30
Belægninger-åbent land
Przyjmowanie ofert·Oct 30
Toftehaven III
Udzielone·Oct 30
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.