Otnox
IEIrlandia·Zamawiający: Dún Laoghaire-Rathdown County Council

DLR Co Co - Multi-Party Framework Agreement for Landscape Architect Led Integrated Design Team Services

Zamknięte·22 paź 2024

Integrated Design Team to Include: Landscape Architect (Lead Consultant and Employers Representative), Civil and Structural Engineer, Urban Drainage Design Specialist, Electrical Services Engineer, Quantity Surveyor, Disability Access Consultancy (DAC) and Project Supervisor Design Process Services. Initial Contract for Consultancy Services: The appointed team for the initial project will be responsible for the design, tendering and construction stage administration of the proposed new park development at Sandyford Business District Civic Park for Dun Laoghaire Rathdown County Council and Sandyford BID. Stages (i) to (v). Initial Project Description: Development of a new park on an existing 0.8 hectare brownfield site. At: Corrig Road / Carmanhall Road, Sandyford Industrial Estate, Sandyford, Co. Dublin.

Opublikowano

22.10.2024

Przyjmowanie ofert

22.10.2024

Termin

22.11.2024

Otnox

Znajdź przetargi, w których warto wystartować.

Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.

  • Dokumenty przetargowePrzeglądaj dostępne pliki w jednym obszarze roboczym.
  • Wymagania i ryzykaZleć analizę dokumentów z odnośnikami do źródeł.
  • Twoje wybrane przetargiKontynuuj z wybranymi rynkami i branżami.