The principle, long term objective of the Cwmystwyth project is the reduction of metal loadings entering the Afon Ystwyth from the Cwmystwyth site. The proposed works aim to significantly reduce (by up to 50% immediately downstream) concentrations / loadings of dissolved lead and zinc in the Ystwyth, as well as a significant (but currently unquantifiable) reduction in the amount of fine grained, metal rich sediment newly entering the main river system through erosion of exposed spoil and in channel deposits at Cwmystwyth (and associated dissolved phase contamination from leaching). The works aim to directly improve a stretch, estimated at 7km, of the river downstream of Cwmystwyth. Project objectives are to: • Deliver water quality betterment in the receiving waterbody that will achieve wider environmental benefits. • Maintain and enhance the natural environment and the well-bring of the community. Helping to achieve NRW Well-Bring Objectives and Environment (Wales) Act duties. • Engage the community and internal and external stakeholders to deliver an acceptable solution. • Minimise impacts to ecology and heritage - the site has numerous high value and sensitive environmental receptors and has 5 formal environmental designations and linked hydraulically to three more designated sites.
Termin
22.04.2025
Opublikowano
20.01.2026
Udzielone
20.01.2026
Sharnberry Mine Water Treatment Scheme (MwTS) Design & Build - Phase One
Udzielone·Oct 30
WAN + Server Switch Replacement & Associated Services
Udzielone·Oct 9
IT Hardware Call Off
Udzielone·Aug 7
Board Management Tool Software
Udzielone·Jun 29
Nent Haggs Compound Reinstatement
Udzielone·Jun 3
NEC4 ECC Project Manager, ECC Supervisor, Commercial Manager & Environmental Clerk of Works (ECoW) for the Dylife project
Udzielone·Jun 1
High Level Strategic Masterplan Framework for the East of Harlow Strategic Masterplan Area
Udzielone·Oct 15
CGC Evidence Base - Rural Southern Cluster Spatial Framework
Udzielone·Sep 25
Planning Support Function to Weybridge
Udzielone·Apr 30
Planning Support Function to Weybridge
Udzielone·Apr 30
To undertake a Sustainability Appraisal (SA) (incorporating Strategic Environmental Assessment and a Health Impact Assessment) of the emerging Somerset Local Plan 2025 - 2045 and provide associated SA Reports to accompany the stages of plan production, consultation, publication, submission and adoption as necessary. Somerset Council has already produced a SA Scoping Report (Stage A), this tender refers to refining alternatives and assessing the effects of the emerging Local Plan (Stage B), the production of the SA (Stage C) and amend the SA following consultation (Stage D).
Udzielone·Jan 21
Cwmystwyth Planning and Design
Udzielone·Jan 20
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Udzielone·Oct 31
March 2027 Bus Contracts
Udzielone·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Udzielone·Oct 30
Provision of Pre-Paid Cards
Udzielone·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Udzielone·Oct 30
Business Travel Services
Udzielone·Oct 30
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.