In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Termin
01.06.2026
Opublikowano
14.10.2026
Udzielone
14.10.2026
CareCubed Social Care Costing Software
Udzielone·Oct 27
Heron Hill - Window & Door Replacement
Udzielone·Oct 20
Legal Services Contract for the Heart of Barrow
Udzielone·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Udzielone·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Udzielone·Oct 6
CWF Lot 1B - WF2506 04 Askam Village School - Electrical and Fabric Works
Udzielone·Oct 6
Nether Bridge Parapet Repairs
Udzielone·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Udzielone·Aug 3
Opswat Metadefender licensing, support and design services
Udzielone·Oct 27
Asbestos surveying and consultancy
Udzielone·Oct 27
ASC Data Platform Development Support
Udzielone·Oct 27
ITEP1273 - Citizen Space -26/28
Udzielone·Oct 27
2026-10-27 09:00 - QBE476 Red Lodge to Innov8 Workshops, Rougham - AWARD
Udzielone·Oct 27
BPB000196 South Mainstream Taxi
Udzielone·Oct 27
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.