Drilling is being undertaken by BOPRC at Boyes Park Reserve – Wylie Street, Rotorua and at Kuirau Park – Kuirau Street, Rotorua for our M-series and G-series monitoring and to further understand the geothermal and shallow geothermal/groundwater systems regarding recovery, recharge and sustainable allocation limits within the reservoir. The lithological information that is collected during the drilling of these bores’ feeds into the conceptual geological models, with this information the extent of each of our aquifers can be mapped. Once these bores are completed, they are being incorporated into BOPRC’s monitoring network where geothermal water levels, water temperature, water chemistry and isotope testing is regularly undertaken. During the drilling of the first bore BOPRC will be looking to collect additional information on the change in pH as drilling moves through the groundwater system and into the reservoir, this will be accompanied by regular temperature recording. A water sample of each of the
Termin
05.01.2026
Opublikowano
28.05.2026
Udzielone
28.05.2026
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Zamknięte·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Zamknięte·Oct 1
Ohineangaanga Stream Remediation Work / Erosion Repairs
Zamknięte·Aug 20
Ohineangaanga Stream Remediation Work / Erosion Repairs
Zamknięte·Aug 19
CON001926 - Whakatane Project Future Proof - Stage 4A
Zamknięte·Aug 3
Whakatāne Project Future Proof – Stage 3B
Zamknięte·Jul 1
PNCC - Waste Water Treatment Plant Seismic Strengthening
Przyjmowanie ofert·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Przyjmowanie ofert·Oct 30
Total Mobility and wider PT Assurance
Przyjmowanie ofert·Oct 30
New Care Response for Taranaki Manawatū
Przyjmowanie ofert·Oct 30
National Parking Equipment Replacement Programme
Przyjmowanie ofert·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Przyjmowanie ofert·Oct 30
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.