The scheme comprises significant public realm improvements to the existing St Botolph's Circus in Colchester, and associated highway works, including new at-grade crossings for active travel models and the removal from use of the existing three subways / underpasses, referred to as the Proposed Scheme. St Botolph's Circus is located to the south of Colchester city centre at the junction of Southway (A134) to the west, Magdalen Street (A134) to the east, Mersea Road (B1025) to the south, and St Botolph's Street to the north. The site functions as a large 'gateway' junction, leading to the city centre. The Future Transport Strategy defines the St Botolph's Circus area as both Zone 1 (city centre) and Zone 4 (Strategic Transport Corridor). The Proposed Scheme aims to: • Create a good quality urban realm and gateway to the city centre. • Develop an improved, safer environment for everyone. • Improve connectivity for communities to local and wider transport networks through bus, rapid transit and rail services and walking and cycling routes. • Ensure an inclusive and accessible area for all. • Balance the requirements of different travel modes • Reduce anti-social behaviour and the fear of crime. • Improve health and wellbeing for Colchester residents. • Increase footfall to encourage wider economic growth of the area, provide development opportunities and support local business. The key elements of the scheme are: • New public realm area to the north east and north west areas of the Circus, with high quality paving, new planting, landscaping and seating. • New at-grade traffic signal-controlled crossings on all four arms of the Circus for active travel modes. • New footways and cycleways, including a link on the north side of Southway between the Circus and Whitwell Road. • Partial filling-in of the existing roundabout and subways / underpasses, including installing pipes in the existing subways for new drainage attenuation. • A new retaining wall on the south-western corner to enable carriageway widening and associated earthworks. • Improved bus stop facilities at the Mersea Road (southbound) stop. • Carriageway widening, reconstruction and surfacing. • Enhanced lining and traffic signal installations. • Surface water drainage works. • Kerbing, footway construction / reconstruction and landscaping including some tree replacement, planting new trees, wildflower planting. • Signage works and street furniture. • Street lighting replacement and upgrades.
Termin
26.09.2025
Opublikowano
27.07.2026
Udzielone
27.07.2026
CO0346 Employee Assistance Programme
Udzielone·Aug 19
PL0085 Dovercourt Public Realm
Udzielone·Jul 24
C006PC - LCWIP 4 CR East Hill Colchester
Udzielone·Jul 24
E-Signature Solution
Udzielone·May 22
EPP0199-R1 M&E Services
Udzielone·May 18
EPP0199-R1 M&E Services
Udzielone·May 18
**Direct Award** Hillheads Estate Phase 1 - Kitchen & Bathroom Installations
Udzielone·Oct 15
** Direct Award ** Fordley Estate Phase 2 Estate - Structural Works
Udzielone·Oct 15
**Direct Award** Riverside Park Estate Phase 2 - Flooring
Udzielone·Oct 15
Unit 22-23 Algernon Industrial Estate - Roofing Replacement
Udzielone·Oct 15
** Mini Competition ** Longbenton Estate Phase 4 - Fire Compartmentation works
Udzielone·Oct 15
** Direct Award ** Clousden Hill Estate - Roof Replacements
Udzielone·Oct 15
Debtor Tracing Services
Udzielone·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Udzielone·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Udzielone·Oct 28
CSP26893 - Administrator
Udzielone·Oct 28
Portering Task Management System
Udzielone·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Udzielone·Oct 28
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.