Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Permanent Way Scope of Work: The supply, installation, testing and commissioning of the new turnback facility to accommodate trains: 1. provision for a 6-car and buffer stop siding facility 2. passive provision for an 8-car and buffer stop turnback facility 3. track drainage This includes all hand back deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
Opublikowano
07.10.2025
Przyjmowanie ofert
07.10.2025
Termin
13.10.2025
Oldfield Road - E & P Works
Zamknięte·Oct 22
Oldfield Road - Telecoms
Zamknięte·Oct 22
Brewery Turnback - ES6-8 Devegetation Works
Zamknięte·Oct 7
Brewery Turnback - ES6-8 E & P Works
Zamknięte·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Zamknięte·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Zamknięte·Oct 7
Manchester International Airport - OLE Phase 3 Works
Zamknięte·Sep 30
Manchester International Airport - Demolition Works
Zamknięte·Aug 27
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Zamknięte·Oct 7
Opswat Metadefender licensing, support and design services
Udzielone·Oct 27
Asbestos surveying and consultancy
Udzielone·Oct 27
ASC Data Platform Development Support
Udzielone·Oct 27
ITEP1273 - Citizen Space -26/28
Udzielone·Oct 27
2026-10-27 09:00 - QBE476 Red Lodge to Innov8 Workshops, Rougham - AWARD
Udzielone·Oct 27
BPB000196 South Mainstream Taxi
Udzielone·Oct 27
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.