This Scheme will cover Active Travel improvements on Shadsworth Road and Haslingden Road, Blackburn, and will encompass the following: • Removal of kerbed centre islands, • Alteration to existing zebra crossing • associated electrical works, • relocation of a kerbline and widening of the footway, • footway reconstruction as necessary, • Alterations to existing AD signage, • Removal and provision of new footway markings, • Footway surface course overlay using tarmac materials or slurry seal • carriageway patching.
Termin
24.03.2026
Opublikowano
07.07.2026
Udzielone
07.07.2026
Carriageway Surfacing 25/26 - Phase 4
Udzielone·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Udzielone·Sep 28
Carriageway Surfacing 26/27 - Phase One
Udzielone·Sep 28
Active Travel 2026 - Phase 1
Udzielone·Jun 10
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Udzielone·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Udzielone·Oct 10
York Street-Wincolmlee Carriageway Maintenance
Udzielone·Oct 27
BBV HS2 MWCC North - Pumped Drainage
Przyjmowanie ofert·Oct 21
Thrybergh War Memorial Civil Works
Udzielone·Oct 7
Greasbrough War Memorial Civil Works
Udzielone·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Zamknięte·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Udzielone·Sep 11
Opswat Metadefender licensing, support and design services
Udzielone·Oct 27
Asbestos surveying and consultancy
Udzielone·Oct 27
ASC Data Platform Development Support
Udzielone·Oct 27
ITEP1273 - Citizen Space -26/28
Udzielone·Oct 27
2026-10-27 09:00 - QBE476 Red Lodge to Innov8 Workshops, Rougham - AWARD
Udzielone·Oct 27
BPB000196 South Mainstream Taxi
Udzielone·Oct 27
Utwórz konto, aby przeanalizować to zamówienie i znaleźć podobne możliwości.