The works are to include, strip the existing waterproofing system in all its parts, including insulation, back to the underlying Cross Laminated Timber deck. Inspect the existing deck for degradation and repair/ replace as necessary. Supply and install a new High-Performance Elastomeric TA-30 warm roof RBM system, incorporating a Parafoam Ultra Tapered Board Insulation scheme, achieving the maximum required U-value of 0.18 W/m²K. All works to include the temporary removal and reinstatement of all mechanical & electrical services.
Frist
12.02.2026
Publisert
04.08.2026
Tildelt
04.08.2026
Planned Roofing Works 27 West
Provisions of External Decoration, Painting and Repair services
GB-Colchester: 0481-PA - Small Flat Roofs (Flats & Maisonettes - Contract G) *Duplicated*
GB-Colchester: Flat Roofing works (small roofs - Houses)
Swarcliffe 2026
Planned Roofing Works 27 North
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.