Otnox
NZNew Zealand·Innkjøper: Christchurch City Council

Turanga Level 1 & 4 Alterations

Åpen for tilbud·8 okt. 2026

The work at Turanga library includes: Level 1 (Hapori): Removal of Playdrum and construction of New Imagination Station (deconstruction of the old); adjustments to the Babychange room; adjustment to the Book Tree; New bespoke seating; Electrical and data installations. Level 4 (Auahatanga): Modifications to the Creative/Production Studio including mechanical ventilation and extraction systems; New flooring to the Recreation space; adjustment to lockers; and Electrical and data installations. Works need to be staged and timed to minimise disruption to Library services.

Publisert

08.10.2026

Åpen for tilbud

08.10.2026

Frist

03.11.2026

Otnox

Finn anskaffelser det er verdt å delta i.

Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.

  • AnskaffelsesdokumenterSe tilgjengelige filer i ett arbeidsområde.
  • Krav og risikoerBestill dokumentanalyse med henvisninger til kildene.
  • Ditt utvalg av anskaffelserFortsett med dine valgte markeder og bransjer.