To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate temporary railheads/connections to the Network Rail infrastructure, to meet the construction logistics requirements for material deliveries by rail and support the requirements of other Railway System Contractors from the Alliance. These railheads/connections require temporary rail track works that will not form part of the final permanent works. The Temporary Railhead designs required are located at: • West Ruislip (Copthall) Temporary Railhead • Chiltern South Temporary Railhead • Berkswell Temporary Railhead • Washwood Heath Temporary Connection The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer. The scope of this required design works are as follows - Track layout and geometry, Track, Track drainage, LWR and S&C hardstanding areas, gantry foundations. Potential mobilization start (soft start) in September 2026 - then estimated full start February 2027.
Publisert
01.05.2026
Åpen for tilbud
01.05.2026
Frist
15.05.2026
Specialist Rail Systems Personnel
Åpen for tilbud·Oct 28
Transport of slabs
Åpen for tilbud·Oct 21
LWR Trailer Solution
Lukket·Aug 18
Temporary Works Designer (Track Design Railhead)
Lukket·May 1
Temporary Works Designer - Framework
Lukket·May 1
Temporary Works Designer - Framework
Lukket·May 1
Specialist Rail Systems Personnel
Åpen for tilbud·Oct 28
NE - CDF - Lot 1 - River Hipper FAS SOC to OBC Appraisal
Tildelt·Oct 27
EAN - AOMR - Lot 1 - Snettisham Hard Defence Repairs
Tildelt·Oct 27
Contract Award Notice - Tree Inspections & Tree Works for Upper Thames 26-27 - Lot 3
Tildelt·Oct 26
Temporary Agency Staff for Drainage Engineer
Tildelt·Oct 20
Technical Approval Authority - Advisor
Tildelt·Sep 29
Infrastructure Connection Design Support - Pathology Lab
Tildelt·Oct 30
Provision of Pre-Paid Cards
Tildelt·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Tildelt·Oct 30
Business Travel Services
Tildelt·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Tildelt·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Tildelt·Oct 30
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.