Publisert
28.08.2026
Åpen for tilbud
28.08.2026
Frist
18.09.2026
Feasibility study for Construction of Latrine blocks (Geotechnical and Topography)
Rehabilitation of Gakararanka-Mariba-Gacaca Water Supply system( 16 Km)
Supply and Installation of Rain Water tanks for Residents of Gahunga-Rugarama and Cyanika
Supply for VUP materials &equipments
Supply of furniture (Desks, Tables & chairs) on framework contract under SGT Project (Pre-Primary Classrooms)
Supervision of Rehabilitation of Gakararanka-Mariba-Gacaca Water Supply system( 10.36 KM)
Provision maintenance Services of Office equipment
Recruitment for a Head of Business Analysis & Product Requirements for District SACCO Digitalization
Supply of bed kits and kitchen sets
Supply and Installation of Two (2) Elevators (Lifts) at the Tri-Ministerial Building
ISOKO RYO GUPAKIRA NO GUPAKURURA IMIZIGO Y'AKARERE
CONDUCT FEASIBILITY STUDY FOR A 10KM TARMAC ROAD IN THE CITY OF KIBUNGO AND SAKE
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.