Loading Otnox...
Otnox
🇱🇷Liberia·Innkjøper: LIBERIA TELECOMMUNICATIONS AUTHORITY

School Connect Project (Starlink Kits Installation)

Tildelt·16 sep. 2026·USD 110,000

Installation of (156) Starlink Kits through the LTA-MOE School Connect Project

Frist

02.06.2026

Publisert

16.09.2026

Tildelt

16.09.2026

© 2026 SIA «Vietne». Alle rettigheter forbeholdt.