Timaru District Council (TDC) is seeking a contractor to construct a new bridge over Otipua Creek between Landsborough Road and Coonoor Road. The existing masonry arch bridge is in poor condition with limited remaining life for vehicle traffic, and ongoing maintenance is constrained by its age and heritage status. The current road alignment and intersection geometry also present safety concerns, including restricted visibility and a history of crashes at the site. To address these issues, Council intends to construct a new 22.5m long, two-lane bridge on an improved alignment, alongside associated road and intersection upgrades, while retaining the existing bridge for pedestrian and cycling use.
Publisert
14.08.2026
Åpen for tilbud
14.08.2026
Frist
18.09.2026
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.