North Hertfordshire District Council is seeking quotations for the removal and replacement of the Reception Passenger Lift at North Herts Leisure Centre, Letchworth. The project requires full design, supply, installation, testing and commissioning of a durable, maintainable lift that is suitable for operation adjacent to a swimming pool environment, including all required tools and documentation to enable fully open protocol maintenance. The works must be delivered safely and efficiently in a live, operational leisure centre, with particular care around public safety, environmental durability, and minimisation of disruption. A 24-month fully comprehensive warranty and maintenance period is required. It must be fully compliant with the Specification at Schedule 2 of this Request for Quotation.
Frist
01.09.2025
Publisert
19.06.2026
Tildelt
19.06.2026
Lot 2 - Housing Lift Modernisation Programme - Various Fulham Sites
Lot 1 - Housing Lift Modernisation Programme - Lytton Estate
Installation, Refurbishment and Upgrading of Passenger Lifts at Farish House.
DN731976 Lift Modernisation Framework Agreement
CA18117 - QMHC LIFT 14 MODERNISATION STH
MBC-1515 Gretton Court, Wilton Court and Bradgate Flats Lift Works
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.