Procurement of a multi-disciplinary design team and principal contractor. • Delivery of enabling and construction works associated with the scanner installations. • Delivery of reconfigurations associated with the operational requirements of the scanner installations. • Commissioning and handover of the project demise to the clinical team.
Frist
03.10.2025
Publisert
02.02.2026
Awarded
02.02.2026
Willow House Enabling Works
Oceansgate Phase 3.1 Enabling Works
Storage Container for ASG Basement Access and CCTV Control
Old Westgate Station Hotel Development, Wakefield
M6 Lune Gorge - Roundthwaite Box - Civils Package
A66 Northern Trans-Pennine (NTP) - Schemes 1 & 2 Enabling works for access to working areas
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.