This procurement procedure regards a contract for P3 - Main Exhibition Contractor for the new Museum Galleries at the Natural History Museum of Denmark ("NHMD"). It concerns the the design, production, engineering and on-site installation of setwork (including scenography), furniture, graphic detailing, graphic production (for non-showcases), setwork lighting, tactile interactives, mounts (not in showcases) to the Ocean Hall and the Underground Galleries. In addition, the main exhibition contractor will be the main responsible for coordination with other specialist contractors, e.g. the contractors responsible for delivering specialist setworks, media content and AV Hardware to the NHMD. For a more thorough description of the task to be performed according to the contract, please see the draft contract and appendices, including the Scope of Works (Appendix 2). The NHMD has decided not to - further - divide the P3 - Main Exhibition Contractor contract into lots as it is the NHMD’s assessment that a single contract with one contractor will result in the most coherent solution and the best user experience.
Publisert
17.10.2024
Åpen for tilbud
17.10.2024
Frist
14.11.2024
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.