The overall scope of works for this project is for the construction of a new wastewater pipeline from Katikati Wastewater Treatment Plant across Tauranga Harbour and Matakana Island and including a new marine outfall typically 1150m long. The scope of works for this contract is to provide ECI pre-construction design/methodology inputs to the consenting and design phase for renewal of cross harbour and island sections, as well as concept design inputs for the marine outfall section (not being consented at this stage). ROI Respondents will be shortlisted to two, such that an appropriate mix of construction methods and skills and experience will be represented. Respondents can offer a single method or multiple methods based on their skills and experience. Please refer to the attached ROI for further details. Please raise all questions via GETS.
Publisert
02.09.2026
Åpen for tilbud
02.09.2026
Frist
25.09.2026
Pūnaha Tautoko Pūkenga – Testing Professional Services
ROI - Otara Wastewater Network Upgrade Design Services
RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build
2813 - Stafford Street and Barnard Street Water Services Renewal
Union Street Foxton - Wastewater and Watermain Renewals 2026-27
Greater Greymouth WTP Pre-treatment Upgrade
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.