Provision of Services to provide an Architect-Led Design Team (ALDT), led by a Lead Architect acting as Lead Consultant, to develop the hospital scheme through RIBA Stages 2-3 and support the Outline Business Case (OBC) submission. This will include preparation of reserved matters planning applications, infrastructure plans, and provision of a fully coordinated multi-disciplinary design aligned with Hospital 2.0, New Hospital Programme (NHP) standards, the Target Operating Model (TOM), and the Trust's redevelopment vision. This appointment also includes design guardianship and NEC supervisor for enabling works. Optional extensions may include RIBA Stage 4 technical design and design assurance through construction. The services will be for an initial period of four (4) years with an option to extend by three (3) periods of up-to twelve (12) months (i.e. a total contract period of up to 7 years) reviewed in-line with the completion of RIBA stage 3 and RIBA 4 dependant on NHP Contractor procurement outcomes. The Architect-Led Design Team must comprise a coordinated group of specialist disciplines, each providing the technical expertise required to deliver an integrated, compliant and fully aligned hospital design, including (but not restricted to): • Lead Architect / Lead Consultant (prime) • BIM Manager • M&E Engineers • Structural Engineers • Civil Engineers • Landscape Architect • Travel & Transport Consultant • Sustainability Advisor (BREEAM / Net Zero) • Fire Advisor • Acoustics Advisor • Building Control Advisor • Inclusive Design Advisor • Digital / IT / Smart Hospital Advisor • Security Advisor • BSA Advisor (Building Safety Act) • Medical Gases Specialist Engineer • Vertical Transport Consultant • Lighting Designer • Wayfinding / Signage Consultant • Waste Management Consultant • Carbon / Whole Life Cost • Art Consultant Specialist (art strategy only) • Enabling works Design Guardian • NEC Supervisor
Frist
05.02.2026
Publisert
03.09.2026
Tildelt
03.09.2026
Bus Franchising - Otley Bus Station Detailed Design
Tildelt·Oct 23
Weymouth Neighbourhood Scheme RIBA 1 & 2 Architectural Services
Tildelt·Sep 30
CA18502 - Architectural Services
Lukket·Sep 28
Design services for the Redevelopment of the former Post Office, London Road North, Lowestoft - AWARD
Tildelt·Sep 16
Dentistry Practice - St Marks (Professional Services)
Tildelt·Sep 8
Regent's Park Estate South Feasibility Masterplan
Tildelt·Sep 2
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.