The Buyer requires a multi-discipline feasibility study covering three development options: Option A1 (residential subdivision with reserve enhancement, maximising yield under the current Medium Residential Sub-zone framework); Option A2 (as A1 but tested against multi-storey attached typologies such as terraces, triplexes, and townhouses); and Option B (cleared site sale with development conditions). The study must assess each option’s technical feasibility, achievable residential yield, consenting pathway, and development costs, and produce a comparative summary suitable for inclusion in a formal Business Case.
Publisert
06.09.2026
Åpen for tilbud
06.09.2026
Frist
25.09.2026
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.