The intent of this RFP is to find a Successful Proponent capable of providing the Work described immediately below. A more detailed description of the Work can be found in Appendix 1 (Information). EPCOR is implementing a dedicated Energy Management System (EMS) in parallel with the Schneider Electric Advanced Distribution Management System (ADMS) v3.11 upgrade. The EMS will provide enhanced transmission system monitoring, control, reliability analysis, and decision-support capabilities, representing a significant evolution from the current operating model where transmission functions are managed within the ADMS environment. To support this transition, EPCOR is seeking an experienced and Succesful Proponent to develop a comprehensive transmission-specific operator training program that equips System Control Operators with the knowledge, skills, and competencies necessary to safely and effectively utilize the new EMS while meeting Alberta Reliability Standards training and qualification requirements. The project will develop two integrated training deliverables along with the associated operational workflows and procedures. The first deliverable will establish a foundational EMS training program covering core system functionality, real-time monitoring and control, switching, alarm management, network visualization, operating procedures, and competency assessments required for initial operator qualification. The second deliverable will focus on advanced EMS applications, including contingency analysis, state estimation, load forecasting, reliability assessment tools, and other analytical functions that support operational decision-making. Additionally, Deliverable 2 will include the development of all EMS specific operational workflows, procedures, and supporting documentation required for the effective use of EMS functionality within EPCOR's System Control Centre. Together, these deliverables will create a sustainable training and operational framework that supports system implementation, operator readiness, regulatory compliance, and the safe and reliable operation of EPCOR's transmission system. EPCOR's transmission system is relatively small compared to those of other Transmission Facility Owners (TFOs). The network consists of 36 substations and a limited amount of 500 kV, 240 kV, and 72 kV transmission infrastructure, including both overhead lines and oil-filled pipe-type cables. City of Edmonton's peak load is approximately 1,300-1,400 MW, representing just over 8% of Alberta's internal electricity demand. Unlike some jurisdictions, EPCOR is not a balancing authority and is not responsible for generation dispatch or system balancing functions. As a result, the scope and complexity of the EMS project are considerably smaller than those associated with the distribution system. The EMS platform will not be fully operational during the development of this training program. However, there will be access to a playpen. The Successful Proponent must demonstrate the ability to develop operator training materials, competency assessments, and operational workflows based on Schneider Electric EMS design documentation, functional specifications, system requirements, use cases, playpen access, and existing implementation experience. EPCOR makes no representations or warranties regarding the accuracy or completeness of the information contained in this RFP. The Proponent is responsible for making its own evaluation of information and data contained in this RFP and in preparing and submitting its Reply.
Publisert
14.10.2026
Lukket
14.10.2026
Frist
21.10.2026
Epcor - Negotiated Request for Proposal - Regulatory AI Tool
Åpen for tilbud·Oct 22
Epcor - Request for Proposal - Woodcroft Substation Fence Replacement
Åpen for tilbud·Oct 14
Epcor - Request for Proposal - PVC Sewer Pipe & Fittings
Åpen for tilbud·Oct 13
Epcor - Request for Proposal - Supply and Delivery of Electrical Items
Åpen for tilbud·Aug 31
University of Calgary - Request for Proposal - Data Center Consultants
Åpen for tilbud·Sep 28
Échantillonnage de matériaux susceptibles de contenir de l'amiante et mise à jour du registre de l'amiante du CIUSSS
Lukket·Sep 23
Energy and Heat Capture Solutions for Northern Ground Source District Heating
Tildelt·Feb 3
Privacy Assessment and Guidance
Tildelt·Jan 9
Energy and Heat Capture Solutions for Northern Ground Source District Heating
Lukket·Nov 7
Energy and Heat Capture Solutions for Northern Ground Source District Heating
Lukket·Nov 7
Air Charter to Pangnirtung From Iqaluit
Åpen for tilbud·Oct 27
Computer Hardware Parts Accessories
Åpen for tilbud·Oct 27
Office Supplies - Laptops
Tildelt·Oct 27
As & When Snow Removal Services
Åpen for tilbud·Oct 27
Education and Childcare - Request for Proposal - Solution Architecture Services
Åpen for tilbud·Oct 27
Forestry and Parks - Request for Quotes - Two (2) 480-550 cc ATV/Quads
Åpen for tilbud·Oct 27
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.