TfL requires a consultant to provide specialist technical and programme support for the A13 (The A-Road) DBFO Handback, ensuring all contractual, statutory, and operational obligations are met ahead of asset transfer in 2030.
Frist
30.06.2026
Publisert
07.09.2026
Tildelt
07.09.2026
Footway Resurfacing_26
Footway Patching and Vehicle Access Construction_26
HAPAS Penetrative Asphalt Preservation_2026
Engineering Consultancy Services - Highway Maintenance Engineer Full Time
Engineering Consultancy Services - Highway Maintenance Engineer
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.