Objectives The objective of the project is to on behalf of the Environment Agency (the Contracting Authority) complete an optioneering study for each of the three sites to identify the preferred option for eel passage. This should then be progressed to detailed design suitable for construction. The eel pass design at each site should deliver the following objectives: • To provide long term safe passage of eels past the structure, and operate reliably during eel and elver migration periods • To provide an eel passage solution that can be safely constructed, operated, maintained and decommissioned; • Is cost-effectivecost-effective to maintain, accessible for cleaning and inspections, and allows for monthly checks without specialist knowledge • To provide an eel pass solution that is robust enough to withstand the hydraulic conditions and debris experienced at each structure. • To provide consideration of whole life costs and whole life carbon to support decision making in the determination of the preferred option • To meet the requirements set out in LIT 75351 AM TA Eel Pass, Fish Pass and Fish Counters Maintenance Instruction and Guide. • Non powered solutions are preferred; however, the Environment Agency will consider more innovative solutions for Houghton Weir.
Frist
19.06.2026
Publisert
16.07.2026
Tildelt
16.07.2026
SCC - EK - RFQ - Ecology Support
PRJ_31125 - SWAN Heating & Cooling Offer - Initial Techno, Economic and Planning Perspective Feasibility Study Created
ENVHNL Phase 8 Borehold Drilling Works
Environmental & Conventional Health & Safety Services
EcoSF4 call-off: Le Strange Fish Surveys
Cambridgeshire County Council Minerals and Waste Local Plan Review - Waste Needs Assessment via ESPO Framework via ESPO Consultancy Services Framework 664_25 (Lot 8h)
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rettigheter forbeholdt.