Central Substation RIBA4 & Build

Buyer: KBS Maritime (UK)

Budget: GBP 1.3M

Published: 2/25/2026

Submission deadline: 3/27/2026

Status: Aktīvs

Category: Construction work

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

Related tenders

  • Rotary Frequency Converter
  • Building Rewire Projects
  • 60Hz Transformer Purchase
  • B Lock Penstocks Replacement
  • North Tyneside Council - Window and External Door replacement Norham High
  • Singlegate Primary School boiler replacement works
  • Askham Village School Portable Classroom Unit
  • W766 - Servicing and repair services

Source: official portal