Otnox
NZNew Zealand·Innkjøper: New Zealand Institute of Skills & Technology

ARA L Block Seismic Strengthening Project

Tildelt·19 des. 2025

Te Pukenga – New Zealand Institute of Skills and Technology trading as ARA Institute of Canterbury is seismically strengthening and refurbishing ARA’s L Block, located in the City Campus, Christchurch. This is required due to the building having a current NBS rating 20% and, therefore, being marked as an earthquake prone building by the Christchurch City Council. Seismic strengthening is the key driver of this project. To install the new structural elements, such as piles, K bracing and post tensioning, there is a vast amount of demolition to be completed. ARA will also be using the opportunity to refurbish the library; particularly in the areas most affected by the strengthening works. The key objective of this procurement is to select a suitably experienced and available contractor to complete the seismic strengthening and refurbishing of ARA’s L Block in the City Campus. It is also crucial that the works are to commence in the 2025-26 Christmas holiday period following the decant of the library to C block; this time period is the only time in which the library can shut down to enable the decant to occur. A supplier briefing will be held on 27 AUGUST 2025, and the site visit on 2 SEPTEMBER 2025. Please email the Senior Project Manager (contact details provided under Site Information) by 22 AUGUST 2025 to register if you wish to attend the supplier briefing and/or the site visit. Each Respondent is limited to 2 persons for the site visit.

Frist

19.09.2025

Publisert

19.12.2025

Tildelt

19.12.2025

Otnox

Finn anskaffelser det er verdt å delta i.

Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.

  • AnskaffelsesdokumenterSe tilgjengelige filer i ett arbeidsområde.
  • Krav og risikoerBestill dokumentanalyse med henvisninger til kildene.
  • Ditt utvalg av anskaffelserFortsett med dine valgte markeder og bransjer.