Loading Otnox...
Otnox
🇩🇰Danmark·Innkjøper: Energinet Eltransmission A/S

145 kV GIS substations for Ølstykke (ØLS)

Tildelt·14 aug. 2026

The Contracting Authority wants to purchase one 3 phase, 145 kV, 50 Hz, gas-insulated switchgear (GIS) Alternative gas, double busbar for substation Ølstykke (ØLS) and delivered on Energinet’s site, ready for operation. The GIS Switchgear will be installed in a new building - The supply consists of 2 line-feeder bays, 2 (two) transformer bays, 1 bus bar coupler bays, and 2 (two) metering bays.

Publisert

14.08.2026

Tildelt

14.08.2026

© 2026 SIA «Vietne». Alle rettigheter forbeholdt.