The works are to include, strip the existing waterproofing system in all its parts, including insulation, back to the underlying Cross Laminated Timber deck. Inspect the existing deck for degradation and repair/ replace as necessary. Supply and install a new High-Performance Elastomeric TA-30 warm roof RBM system, incorporating a Parafoam Ultra Tapered Board Insulation scheme, achieving the maximum required U-value of 0.18 W/m²K. All works to include the temporary removal and reinstatement of all mechanical & electrical services.
Sluitingsdatum
12.02.2026
Gepubliceerd
04.08.2026
Gegund
04.08.2026
Greener Homes Initiative 26/27 - Phase 20
Gegund·Oct 23
Greener Homes Initiative 26/27 - Phase 19
Gegund·Oct 23
Provision of Hillingdon's Growth Plan and StrategicAsset Review
Gegund·Oct 16
LB Hillingdon - Hayes Public Realm Project
Gegund·Oct 16
Further Competition - Architecture + Urbanism Framework (GLA/ TFL reference: GLA81689) Hayes Town Centre Canalside Redevelopment Design Brief
Gegund·Oct 16
LBH21071 - Greener Homes Initiative 26/27 - Phase 13
Gegund·Oct 12
GB-Colchester: 0486-PA - Felt Flat Roof Replacement on Two Storey Blocks - (Contract J)
Gegund·Oct 9
Planned Roofing Works 27 West
Gegund·Sep 16
Provisions of External Decoration, Painting and Repair services
Gegund·Aug 6
GB-Colchester: 0481-PA - Small Flat Roofs (Flats & Maisonettes - Contract G) *Duplicated*
Gegund·Jul 28
GB-Colchester: Flat Roofing works (small roofs - Houses)
Gegund·Jul 28
CA17160 - Provision of Principal Contractor for Re-Roofing Companion Animal House (C.A.H.) Building 106
Gegund·Jun 30
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.