The requirement is to provide a resilient MAN network connectivity for the six UCLH sites with one uplink to three distribution switches in three locations. To provide OS2 fibre from building cabinet to building cabinet using diverse links.
Sluitingsdatum
10.07.2026
Gepubliceerd
24.08.2026
Gegund
24.08.2026
Provision of Wide Area Network services for 3 sites.
C442291 WAN Services
BT WAN SOLUTIONS
Qualtrics - Cloud Professional
Provision of Wide Area Network (WAN) 2025-2028
Internet Protocol (IP) Connect Services
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rechten voorbehouden.