The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to be delivered to allow for the expansion for the 'Evelina PTC' and the additional power requirements and system resilience that this project demands. This paper recommends the award of a contract to ETA Projects Ltd. The new contract will help provide the Trust with a safe and reliable source of power into the future removing the reliance on hired in temporary generators and the expansion of the Evelina Children's Hospital for cancer treatment. This was awarded through the HTE framework Consultancy Solutions and Advisory Services 2023/S 000-024003
Sluitingsdatum
31.10.2025
Gepubliceerd
03.08.2026
Gegund
03.08.2026
Structural and Civils Designer - Somerset and Samaritan Wards
Mechanical, Electrical , Public Health (MEP) Design, Albert, Somerset & Samaritan Wards
Quantity Surveyor Cath Lab and LMER Programmes
Ward Programme (Albert, Somerset, Samaritan Wards) RIBA 0-2 - Architect
St Thomas' Hospital Energy Project - Contract Mobilisation and Project Management Support
Fire Damper Panel Works for Guy's Hospital
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle rechten voorbehouden.