Storage water tank ( SIMTANK) 5000L · Consumable (Plumbing materials- Bottle trap) · Flexible trap for chemical ressistance 1.5'' · Stick shower rose 1/2'' COMPLETE (MAX) · Push pillar tape 1/2'' YOPA · Push urinal valve 1/2'' YOPA · European pan WITH P -TRAP · Lab long neck pillar tape 1/2'' · Flexible pipe chrome 1/2'' length 2 feet · Float ball valve pex 3/4'' · Hand wash basin (Goodone) completes the wall basin
Gepubliceerd
14.09.2026
Open voor inschrijvingen
14.09.2026
Sluitingsdatum
18.09.2026
PROCUREMENT OF CAPRENTRY MATERIALS FOR MUST MAIN CAMPUS PROJECTS
PROCUREMENT OF MASONRY &PAINTING MATERIALS FOR MUST MAIN CAMPUS PROJECTS
Procurement of electrical and other cabling materials for MRCC
Procurement of materials for maintenance of Energy generating equipment for MRCC
Supply, Installation, Testing, and Commissioning of a Standby Generator at CoSTE
Supply of Office Furniture at MUST Main Campus
Supply of school related furniture (for classroom, laboratory, dormitory, library or dining hall)
Routine Maintenance (5.2km) along Kiziramuyaga-Kyota Road at CH:0+000-5+200(CBRM)
Routine Maintenance (5.0km) along Kamishango-Kimeya road at CH:0+000-5+000(CBRM)
Supply of Foodstuffs
Routine Maintenance (5.3km) along Kamishango-Kimeya road at CH:5+000-10+300(CBRM)
Supply of Drugs and Pharmaceutical Products
© 2026 SIA «Vietne». Alle rechten voorbehouden.