Gepubliceerd
08.10.2025
Open
08.10.2025
Sluitingsdatum
08.10.2025
Student Support
CONTINUATION AND COMPLETION OF 7-UNIT GROUND FLOOR CLASS ROOM BLOCK
CONTINUATION AND COMPLETION OF FIRST FLOOR HEALTH CARE CENTRE
LOT 9: CONSTRUCTION OF 1NO. (4M X 2M X 15M LONG) BOX CULVERT AND 2M X 1.5M X 50M LONG STORM DRAIN WITH APPROACH FILLING WORKS AND ASPHALT FINISH.
LOT 7: CONSTRUCTION OF 1NO. (3M X 2M X 12M LONG) BOX CULVERT WITH APPROACH FILLING WORKS AND CONSTRUCTION OF 2 M X 1.2 M 120 M LONG STORM DRAIN
LOT 6: CONSTRUCTION OF 1 NO. (2.0M X 1.2M X 8M LONG) BOX CULVERT WITH APPROACH FILLING WORKS
Airconditions and fans for six new regions
Re-Roofing and Ancilary Works at Cape Coast Branch Manager's Residence
PROCURE 150 HOUSEHOLD REFUSE CONTAINERS
Supply of Spare Parts (Fuel Filter)
Procurement of Digital Smart LED Podium for Corporate Use
Construction of CHPS Compound (Clinical Services Block) at Ngnoman
© 2026 SIA «Vietne». Alle rechten voorbehouden.