Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of both non intrusive and intrusive surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. The work scope requires the completion of structural surveys on bridges spanning roads and existing rail assets. Instructed work may include visual and dimensional surveys of assets, ground-breaking activities associated such as foundation pitting and trenching , masonry coring as well as 3D mapping of assets.
Gepubliceerd
16.09.2026
Open voor inschrijvingen
16.09.2026
Sluitingsdatum
22.09.2026
Kier Infrastructure - UXO Site Surveys
Gesloten·Sep 28
Kier Infrastructure - Cultural Heritage Surveys
Gesloten·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Gesloten·May 26
Kier Infrastructure - Water Environment Surveys
Gesloten·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Gesloten·May 26
Kier Infrastructure - Air Quality Surveys
Gesloten·May 26
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q2 2026
Gegund·Oct 26
Stock Condition Surveys (Commercial and Educational Buildings)
Gegund·Jul 31
WCC - Dynamic Purchasing System (DPS) for Road Traffic Surveys Q1 2026
Gegund·Jul 23
CA18150 - Area Measurement Reports
Gegund·Jul 23
ENQ1301 - CYP 2026/27 Condition Surveys
Gegund·Jun 26
GB-St Helens: Asbestos Surveying Contract Award Notice
Gegund·Jun 12
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.