The project involves the replacement of two chiller units located within the external plant compound at the Central Annexe Building, together with the installation of a new buffer vessel to support the upgraded cooling system. Key supporting works include: •Provision and installation of a temporary chiller unit to maintain building operations and cooling continuity during the replacement works. •Coordination with the separate chiller supplier, including delivery management and crane operations for installation. •Temporary modifications to the existing steel plant enclosure to facilitate removal and installation of plant. •Permanent structural modifications to the steel plant supports to accommodate and support the new chillers and buffer vessel. •Removal and upgrade of the associated electrical infrastructure. •Reinstatement, recertification, and making good of all affected fire stopping and compartmentation measures. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Gepubliceerd
29.06.2026
Open voor inschrijvingen
29.06.2026
Sluitingsdatum
24.07.2026
CA18455 - R9309 Ferguson House Emergency Lighting
QEHKL232 DC5 Control Panel Replacement
Replacement of DB Boards (SWQ3135,SWQ3136,SWQ3144,SWQ3164)
Barnes Z Block Distribution Board Replacement
W5007 Electric Vehicle Charging Network Infrastructure
Lindsay S and T Blocks Lighting Upgrades
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
Monitoring Support and Data Management Services for Continuous Air Quality Monitoring Sites
NHP - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract FHFT
SEN20465-SEN-TAXI-THE NEWBRIDGE SCHOOL
Corporate Eyecare Services
© 2026 SIA «Vietne». Alle rechten voorbehouden.