The purpose of this Contract Award is to appoint a Lead Architectural Consultant to work alongside specialist sub-consultants in Structural engineering and Mechanical & Electrical/drainage, to deliver a comprehensive RIBA Stage 1 Feasibility Study and capital cost estimate for the full replacement of the flat and pitched roofs at Stoke Newington Town Hall (SNTH).
Sluitingsdatum
31.07.2026
Gepubliceerd
24.08.2026
Gegund
24.08.2026
NW CDF Lot 1 Failure Mode Affect Analysis
NCC1927 Northumberland Local Plan Transport Evidence Base
Hackney Service Centre cooling system redesign feasibility study
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
FCDO Port Louis New HC Residence Project RIBA Stage 4 Design Peer Review Services
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rechten voorbehouden.