The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed
Gepubliceerd
23.02.2026
Gegund
23.02.2026
Udbud af visiteret kørsel
Udbud af daglige bankforretninger og portefølje management til Bornholms Regionskommune 2027 - 2033
Improved Data Collection, Monitoring and Revenue Base for Water Resource Management in Kenya
Amgros 2027 1.1491.a
Udbud af kontrakt vedrørende levering af SRO/SCADA-system, inkl. eltekniske entrepriser
Afsætning af Haveaffald og A2-Træ - Fredericia Kommune
© 2026 SIA «Vietne». Alle rechten voorbehouden.