In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Sluitingsdatum
01.06.2026
Gepubliceerd
14.10.2026
Gegund
14.10.2026
CWF Lot 2A - Waterside, Kendal - Retaining Wall Repair and Maintenance Works
Gegund·Nov 2
D-TRO Project 2026 Support Services
Gegund·Oct 28
CareCubed Social Care Costing Software
Gegund·Oct 27
Heron Hill - Window & Door Replacement
Gegund·Oct 20
Legal Services Contract for the Heart of Barrow
Gegund·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Gegund·Oct 9
Nether Bridge Parapet Repairs
Gegund·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Gegund·Aug 3
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.